Irish calendar

Keep Dublin and Belfast holiday rosters separate

Compare actual location-specific availability instead of treating the entire island as one workplace calendar.

A project with staff in Dublin and Belfast needs each team’s published operating calendar. Ireland’s statutory public holiday list does not establish Northern Ireland’s bank holiday dates or either office's observed days.

Build two dated lists and compare available dates individually for work needing both teams. A monthly total alone does not identify dates that overlap.

Use Irish public holidays to reproduce the main comparisons.

A worked record and its alternatives

The following examples compare the weekday pattern with and without statutory dates. Check the impact of a workweek setting before combining schedules.

August public holiday, Monday · 4 August 2025

Subtract the applicable statutory dates. 20 working days. Use the workweek only. 21 working days.

This month has 31 dates, with 10 removed by the weekly pattern. The Irish date list removes 1 additional working dates. The highlighted date belongs to the statutory calendar.

The monthly exclusion can include more than one holiday. Compare the actual dates before attributing the entire difference to August public holiday.

Record operating closures independently from the holiday names. A service can schedule different opening hours or a separate observed closure, especially when a statutory date already falls on a weekend.

An Irish operating-roster check can zoom in from the month total to 2 August 2025 through 8 August 2025. Compare 5 working days under a weekday-only model with 4 working days once the relevant Irish statutory dates are also excluded. August public holiday is 4 August 2025. The holiday count for this short range is 1, which can include other specific dates lying close to it. Starting at 2 August 2025, a movement of 3 working days reaches 6 August 2025 without the statutory exclusions and 7 August 2025 with them. Compare the actual dates retained by your office before treating either model as its service schedule.

August public holiday, Monday · 3 August 2026

  • Subtract the applicable statutory dates · 20 working days
  • Use the workweek only · 21 working days

An Irish operating-roster check can zoom in from the month total to 31 July 2026 through 8 August 2026. Compare 6 working days under a weekday-only model with 5 working days once the relevant Irish statutory dates are also excluded. August public holiday is 3 August 2026. The holiday count for this short range is 1, which can include other specific dates lying close to it. Starting at 31 July 2026, a movement of 4 working days reaches 6 August 2026 without the statutory exclusions and 7 August 2026 with them. Compare the actual dates retained by your office before treating either model as its service schedule.

August public holiday, Monday · 2 August 2027

Applied choiceComputed value
Subtract the applicable statutory dates21 working days
Use the workweek only22 working days

This month has 31 dates, with 9 removed by the weekly pattern. The Irish date list removes 1 additional working dates. The highlighted date belongs to the statutory calendar.

An Irish operating-roster check can zoom in from the month total to 29 July 2027 through 8 August 2027. Compare 7 working days under a weekday-only model with 6 working days once the relevant Irish statutory dates are also excluded. August public holiday is 2 August 2027. The holiday count for this short range is 1, which can include other specific dates lying close to it. Starting at 29 July 2027, a movement of 5 working days reaches 5 August 2027 without the statutory exclusions and 6 August 2027 with them. Compare the actual dates retained by your office before treating either model as its service schedule.

22 August 2026 through 29 August 2026

When a staffing record uses a substitute holiday, include the actual non-working date from the roster. A date excluded twice for different reasons does not create two missing positions.

Include both dated endpoints. 4 working days. Exclude the start and retain the end. 4 working days.

The second run contains 7 dates before exclusions. Its corresponding weekly and applicable closure rows read 2 and 1.

With both ends included the list contains 8 dates before exclusions. The weekly pattern removes 3 of them. A dated closure on 24 August 2026 is checked for overlap with dates already excluded, which leaves 1 further eligible closures.

A separate endpoint check on the same roster uses 22 August 2026 through 3 September 2026. The inclusive reading contains 13 calendar dates before exclusions and leaves 8 working days. Beginning after 22 August 2026 changes the range to 12 calendar dates and leaves 8 working days. The closure field is 2026-08-24. If the target date is later than the start but that entered exception lies outside the range, its presence in the roster supplies context without reducing either count.

August public holiday, Monday · 6 August 2029

Subtract the applicable statutory dates. 22 working days. Use the workweek only. 23 working days.

This month has 31 dates, with 8 removed by the weekly pattern. The Irish date list removes 1 additional working dates. The highlighted date belongs to the statutory calendar.

An Irish operating-roster check can zoom in from the month total to 4 August 2029 through 11 August 2029. Compare 5 working days under a weekday-only model with 4 working days once the relevant Irish statutory dates are also excluded. August public holiday is 6 August 2029. The holiday count for this short range is 1, which can include other specific dates lying close to it. Starting at 4 August 2029, a movement of 4 working days reaches 9 August 2029 without the statutory exclusions and 10 August 2029 with them. Compare the actual dates retained by your office before treating either model as its service schedule.

August public holiday, Monday · 5 August 2030

  • Subtract the applicable statutory dates · 21 working days
  • Use the workweek only · 22 working days

An Irish operating-roster check can zoom in from the month total to 2 August 2030 through 11 August 2030. Compare 6 working days under a weekday-only model with 5 working days once the relevant Irish statutory dates are also excluded. August public holiday is 5 August 2030. The holiday count for this short range is 1, which can include other specific dates lying close to it. Starting at 2 August 2030, a movement of 5 working days reaches 9 August 2030 without the statutory exclusions and 12 August 2030 with them. Compare the actual dates retained by your office before treating either model as its service schedule.

Find the schedule used by each location

Inspect the Irish calendar for an Irish reference and check the independently published Northern Ireland timetable. UK bank holiday dates

Pros and cons of the approach

Pros. A separate dated roster preserves regional and employer exceptions.

Cons. Combining closure lists without an availability rule can wrongly remove a date when one team can still work.

What belongs in the final record

Save separate lists and the decision about joint availability with the project plan.

August public holiday, Monday · 2 August 2038

Subtract the applicable statutory dates. 21 working days. Use the workweek only. 22 working days.

An Irish operating-roster check can zoom in from the month total to 30 July 2038 through 7 August 2038. Compare 6 working days under a weekday-only model with 5 working days once the relevant Irish statutory dates are also excluded. August public holiday is 2 August 2038. The holiday count for this short range is 1, which can include other specific dates lying close to it. Starting at 30 July 2038, a movement of 4 working days reaches 5 August 2038 without the statutory exclusions and 6 August 2038 with them. Compare the actual dates retained by your office before treating either model as its service schedule.

August public holiday, Monday · 1 August 2039

  • Subtract the applicable statutory dates · 22 working days
  • Use the workweek only · 23 working days

An Irish operating-roster check can zoom in from the month total to 28 July 2039 through 7 August 2039. Compare 7 working days under a weekday-only model with 6 working days once the relevant Irish statutory dates are also excluded. August public holiday is 1 August 2039. The holiday count for this short range is 1, which can include other specific dates lying close to it. Starting at 28 July 2039, a movement of 5 working days reaches 4 August 2039 without the statutory exclusions and 5 August 2039 with them. Compare the actual dates retained by your office before treating either model as its service schedule.

Records to compare before using this method

Compare the stated conditions and retain the date or instant associated with each reading.

Recorded exampleFirst settingFirst resultComparison settingComparison result
August public holiday, Monday · 4 August 2031Subtract the applicable statutory dates20 working daysUse the workweek only21 working days
25 September 2026 through 29 September 2026Include both dated endpoints3 working daysExclude the start and retain the end2 working days
August public holiday, Monday · 1 August 2033Subtract the applicable statutory dates22 working daysUse the workweek only23 working days
August public holiday, Monday · 7 August 2034Subtract the applicable statutory dates22 working daysUse the workweek only23 working days
August public holiday, Monday · 6 August 2035Subtract the applicable statutory dates22 working daysUse the workweek only23 working days
21 December 2026 through 29 December 2026Include both dated endpoints6 working daysExclude the start and retain the end5 working days
August public holiday, Monday · 3 August 2037Subtract the applicable statutory dates20 working daysUse the workweek only21 working days

10 June 2027 through 15 June 2027

Include both dated endpoints. 4 working days. Exclude the start and retain the end. 3 working days.

The second run contains 5 dates before exclusions. Its corresponding weekly and applicable closure rows read 2 and 0.

With both ends included the list contains 6 dates before exclusions. The weekly pattern removes 2 of them. A dated closure on 12 June 2027 is checked for overlap with dates already excluded, which leaves 0 further eligible closures.

A separate endpoint check on the same roster uses 10 June 2027 through 19 June 2027. The inclusive reading contains 10 calendar dates before exclusions and leaves 7 working days. Beginning after 10 June 2027 changes the range to 9 calendar dates and leaves 6 working days. The closure field is 2027-06-12. If the target date is later than the start but that entered exception lies outside the range, its presence in the roster supplies context without reducing either count.

Questions readers may need to resolve

Is every Irish statutory holiday a Northern Ireland bank holiday?

Check each jurisdiction’s official dates and the actual office operating plan.

How do I find dates both teams can work?

Compare actual retained calendar dates and keep only those shared under the plan.

Should I subtract any closure from both teams?

Only when both teams close or the activity explicitly needs both available.

What if the offices use different opening hours?

Resolve each local working window and check whether the required meeting duration fits.

Why keep the regional lists after the calculation?

They explain later changes and prevent mistaken handling of separate closure dates.

What stays fixed in the August public holiday, Monday · 4 August 2031 comparison?

The source example stays fixed while the method changes from Subtract the applicable statutory dates to Use the workweek only. The first reading gives 20 working days and the comparison gives 21 working days. The monthly exclusion can include more than one holiday. Compare the actual dates before attributing the entire difference to August public holiday.

Which details let me reproduce the 21 December 2026 through 29 December 2026 example?

The second run contains 8 dates before exclusions. Its corresponding weekly and applicable closure rows read 2 and 1. When a staffing record uses a substitute holiday, include the actual non-working date from the roster. A date excluded twice for different reasons does not create two missing positions.

How should I read the result in the August public holiday, Monday · 3 August 2037 example?

This month has 31 dates, with 10 removed by the weekly pattern. The Irish date list removes 1 additional working dates. The highlighted date belongs to the statutory calendar.

Explore the other Daylooply articles →