St Patrick’s Day is 17 March. Its weekday changes over the years. If that date falls on a Saturday and the selected roster already skips Saturdays, it does not remove another working date in that calculation.
A workplace can handle benefits or an observed closure through its own applicable arrangements. An extra Monday belongs in the dated closure list only when the actual timetable calls for it.
Use Irish public holidays to reproduce the main comparisons.
Records to compare before using this method
Compare the stated conditions and retain the date or instant associated with each reading.
| Recorded example | First setting | First result | Comparison setting | Comparison result |
|---|---|---|---|---|
| St Patrick’s Day, Monday · 17 March 2031 | Subtract the applicable statutory dates | 20 working days | Use the workweek only | 21 working days |
| 26 April 2026 through 30 April 2026 | Include both dated endpoints | 3 working days | Exclude the start and retain the end | 3 working days |
| St Patrick’s Day, Thursday · 17 March 2033 | Subtract the applicable statutory dates | 22 working days | Use the workweek only | 23 working days |
| St Patrick’s Day, Friday · 17 March 2034 | Subtract the applicable statutory dates | 22 working days | Use the workweek only | 23 working days |
| St Patrick’s Day, Saturday · 17 March 2035 | Subtract the applicable statutory dates | 21 working days | Use the workweek only | 22 working days |
| 22 July 2026 through 30 July 2026 | Include both dated endpoints | 6 working days | Exclude the start and retain the end | 5 working days |
| St Patrick’s Day, Tuesday · 17 March 2037 | Subtract the applicable statutory dates | 21 working days | Use the workweek only | 22 working days |
Save the actual closure date as well as the national date used for reference.
Start with the statutory date before applying the roster
Record the official date, weekday and any published operating exception independently. Workplace Relations Commission guidance
A worked record and its alternatives
The following examples compare the weekday pattern with and without statutory dates. Compare a weekday year with a weekend year before scheduling staff.
St Patrick’s Day, Monday · 17 March 2025
This month has 31 dates, with 10 removed by the weekly pattern. The Irish date list removes 1 additional working dates. The highlighted date belongs to the statutory calendar.
- Subtract the applicable statutory dates · 20 working days
- Use the workweek only · 21 working days
Record operating closures independently from the holiday names. A service can schedule different opening hours or a separate observed closure, especially when a statutory date already falls on a weekend.
The monthly exclusion can include more than one holiday. Compare the actual dates before attributing the entire difference to St Patrick’s Day.
An Irish operating-roster check can zoom in from the month total to 15 March 2025 through 21 March 2025. Compare 5 working days under a weekday-only model with 4 working days once the relevant Irish statutory dates are also excluded. St Patrick’s Day is 17 March 2025. The holiday count for this short range is 1, which can include other specific dates lying close to it. Starting at 15 March 2025, a movement of 3 working days reaches 19 March 2025 without the statutory exclusions and 20 March 2025 with them. Compare the actual dates retained by your office before treating either model as its service schedule.
St Patrick’s Day, Tuesday · 17 March 2026
| Applied choice | Computed value |
|---|---|
| Subtract the applicable statutory dates | 21 working days |
| Use the workweek only | 22 working days |
This month has 31 dates, with 9 removed by the weekly pattern. The Irish date list removes 1 additional working dates. The highlighted date belongs to the statutory calendar.
An Irish operating-roster check can zoom in from the month total to 14 March 2026 through 22 March 2026. Compare 5 working days under a weekday-only model with 4 working days once the relevant Irish statutory dates are also excluded. St Patrick’s Day is 17 March 2026. The holiday count for this short range is 1, which can include other specific dates lying close to it. Starting at 14 March 2026, a movement of 4 working days reaches 19 March 2026 without the statutory exclusions and 20 March 2026 with them. Compare the actual dates retained by your office before treating either model as its service schedule.
St Patrick’s Day, Wednesday · 17 March 2027
Subtract the applicable statutory dates. 21 working days. Use the workweek only. 23 working days.
This month has 31 dates, with 8 removed by the weekly pattern. The Irish date list removes 2 additional working dates. The highlighted date belongs to the statutory calendar.
An Irish operating-roster check can zoom in from the month total to 13 March 2027 through 23 March 2027. Compare 7 working days under a weekday-only model with 6 working days once the relevant Irish statutory dates are also excluded. St Patrick’s Day is 17 March 2027. The holiday count for this short range is 1, which can include other specific dates lying close to it. Starting at 13 March 2027, a movement of 5 working days reaches 19 March 2027 without the statutory exclusions and 22 March 2027 with them. Compare the actual dates retained by your office before treating either model as its service schedule.
23 March 2026 through 30 March 2026
Include both dated endpoints. 5 working days. Exclude the start and retain the end. 4 working days.
With both ends included the list contains 8 dates before exclusions. The weekly pattern removes 2 of them. A dated closure on 25 March 2026 is checked for overlap with dates already excluded, which leaves 1 further eligible closures.
The second run contains 7 dates before exclusions. Its corresponding weekly and applicable closure rows read 2 and 1.
When a staffing record uses a substitute holiday, include the actual non-working date from the roster. A date excluded twice for different reasons does not create two missing positions.
A separate endpoint check on the same roster uses 23 March 2026 through 4 April 2026. The inclusive reading contains 13 calendar dates before exclusions and leaves 9 working days. Beginning after 23 March 2026 changes the range to 12 calendar dates and leaves 8 working days. The closure field is 2026-03-25. If the target date is later than the start but that entered exception lies outside the range, its presence in the roster supplies context without reducing either count.
St Patrick’s Day, Saturday · 17 March 2029
This month has 31 dates, with 9 removed by the weekly pattern. The Irish date list removes 0 additional working dates. The highlighted date belongs to the statutory calendar.
- Subtract the applicable statutory dates · 22 working days
- Use the workweek only · 22 working days
An Irish operating-roster check can zoom in from the month total to 15 March 2029 through 22 March 2029. Compare 6 working days under a weekday-only model with 6 working days once the relevant Irish statutory dates are also excluded. St Patrick’s Day is 17 March 2029. The holiday count for this short range is 0, which can include other specific dates lying close to it. Starting at 15 March 2029, a movement of 4 working days reaches 21 March 2029 without the statutory exclusions and 21 March 2029 with them. Compare the actual dates retained by your office before treating either model as its service schedule.
St Patrick’s Day, Sunday · 17 March 2030
| Applied choice | Computed value |
|---|---|
| Subtract the applicable statutory dates | 21 working days |
| Use the workweek only | 21 working days |
This month has 31 dates, with 10 removed by the weekly pattern. The Irish date list removes 0 additional working dates. The highlighted date belongs to the statutory calendar.
An Irish operating-roster check can zoom in from the month total to 14 March 2030 through 23 March 2030. Compare 7 working days under a weekday-only model with 7 working days once the relevant Irish statutory dates are also excluded. St Patrick’s Day is 17 March 2030. The holiday count for this short range is 0, which can include other specific dates lying close to it. Starting at 14 March 2030, a movement of 5 working days reaches 21 March 2030 without the statutory exclusions and 21 March 2030 with them. Compare the actual dates retained by your office before treating either model as its service schedule.
What belongs in the final record
St Patrick’s Day, Wednesday · 17 March 2038
This month has 31 dates, with 8 removed by the weekly pattern. The Irish date list removes 1 additional working dates. The highlighted date belongs to the statutory calendar.
- Subtract the applicable statutory dates · 22 working days
- Use the workweek only · 23 working days
An Irish operating-roster check can zoom in from the month total to 14 March 2038 through 22 March 2038. Compare 6 working days under a weekday-only model with 5 working days once the relevant Irish statutory dates are also excluded. St Patrick’s Day is 17 March 2038. The holiday count for this short range is 1, which can include other specific dates lying close to it. Starting at 14 March 2038, a movement of 4 working days reaches 18 March 2038 without the statutory exclusions and 19 March 2038 with them. Compare the actual dates retained by your office before treating either model as its service schedule.
St Patrick’s Day, Thursday · 17 March 2039
| Applied choice | Computed value |
|---|---|
| Subtract the applicable statutory dates | 22 working days |
| Use the workweek only | 23 working days |
An Irish operating-roster check can zoom in from the month total to 13 March 2039 through 23 March 2039. Compare 8 working days under a weekday-only model with 7 working days once the relevant Irish statutory dates are also excluded. St Patrick’s Day is 17 March 2039. The holiday count for this short range is 1, which can include other specific dates lying close to it. Starting at 13 March 2039, a movement of 5 working days reaches 18 March 2039 without the statutory exclusions and 21 March 2039 with them. Compare the actual dates retained by your office before treating either model as its service schedule.
Pros and cons of the approach
Pros. A deduplicated date list helps explain why a statutory holiday can produce no additional weekday exclusion.
Cons. An assumed Monday shift can put the wrong date in a staff schedule.
9 January 2027 through 14 January 2027
Include both dated endpoints. 3 working days. Exclude the start and retain the end. 3 working days.
With both ends included the list contains 6 dates before exclusions. The weekly pattern removes 2 of them. A dated closure on 11 January 2027 is checked for overlap with dates already excluded, which leaves 1 further eligible closures.
The second run contains 5 dates before exclusions. Its corresponding weekly and applicable closure rows read 1 and 1.
A separate endpoint check on the same roster uses 9 January 2027 through 18 January 2027. The inclusive reading contains 10 calendar dates before exclusions and leaves 5 working days. Beginning after 9 January 2027 changes the range to 9 calendar dates and leaves 5 working days. The closure field is 2027-01-11. If the target date is later than the start but that entered exception lies outside the range, its presence in the roster supplies context without reducing either count.
Questions readers may need to resolve
Does the statutory date move from 17 March?
The list keeps 17 March. A workplace can publish a different operating date or benefit.
Can a Saturday roster count that date?
If Saturday is normally worked, a closure on that date affects the local count.
How does an assumed substitute day change the result?
It can remove a date that would otherwise remain. Use the actual observed closure.
Do March holiday totals always reflect only St Patrick’s Day?
Easter Monday can also fall in March. Inspect the full dated list.
How can I verify the printed weekday?
Use the full year and 17 March in a weekday finder.
What stays fixed in the St Patrick’s Day, Monday · 17 March 2031 comparison?
The source example stays fixed while the method changes from Subtract the applicable statutory dates to Use the workweek only. The first reading gives 20 working days and the comparison gives 21 working days. The monthly exclusion can include more than one holiday. Compare the actual dates before attributing the entire difference to St Patrick’s Day.
Which details let me reproduce the 22 July 2026 through 30 July 2026 example?
The second run contains 8 dates before exclusions. Its corresponding weekly and applicable closure rows read 2 and 1. When a staffing record uses a substitute holiday, include the actual non-working date from the roster. A date excluded twice for different reasons does not create two missing positions.
How should I read the result in the St Patrick’s Day, Tuesday · 17 March 2037 example?
This month has 31 dates, with 9 removed by the weekly pattern. The Irish date list removes 1 additional working dates. The highlighted date belongs to the statutory calendar.